South Bank Path Closure

Starting in July 2019, the South Bank Path will close for up to two years to allow for construction of the Downtown Riverfront site, including a new path through the redevelopment Riverfront Park. The closure will be between the Peter DeFazio and the Frohnmayer bridges. Access to the path from 8th Ave. and Hilyard will be closed during parts of 2019 and 2020.

Closing the path will give crews space to safely work, as large construction equipment will be moving through the area. People are encouraged to use the Frohnmayer and DeFazio bridges to detour through Alton Baker Park. Construction is expected to be completed by Spring of 2021.
Categories: Downtown, riverfront, parks
Share South Bank Path Closure on Facebook Share South Bank Path Closure on Twitter Share South Bank Path Closure on Linkedin Email South Bank Path Closure link

The Downtown Riverfront Park is now open! 

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>