Riverfront Park Plaza

Share Riverfront Park Plaza on Facebook Share Riverfront Park Plaza on Twitter Share Riverfront Park Plaza on Linkedin Email Riverfront Park Plaza link

Public engagement on this project has ended. Project updates will continue to be posted to this page.

Plaza design was completed in Summer 2023. Construction is expected to begin in Summer of 2024 with the plaza opening in Summer 2025. When the riverfront property is fully developed, the one-acre park plaza will be nestled between multi-family housing buildings and a restaurant.

Plaza design was completed in Summer 2023. Construction is expected to begin in Summer of 2024 with the plaza opening in Summer 2025. When the riverfront property is fully developed, the one-acre park plaza will be nestled between multi-family housing buildings and a restaurant.

Public engagement on this project has ended. Project updates will continue to be posted to this page.

  • Share Are designers taking into account probabilities of flooding occurences? on Facebook Share Are designers taking into account probabilities of flooding occurences? on Twitter Share Are designers taking into account probabilities of flooding occurences? on Linkedin Email Are designers taking into account probabilities of flooding occurences? link

    Are designers taking into account probabilities of flooding occurences?

    Lami asked over 2 years ago

    During the first phase of the Downtown Riverfront Park design we worked closely with specialty river engineers to assure the strength of the river bank during flooding. Historically, the river has never been recorded as flooding the site, but if we do get very high water, we’ve constructed the banks to withstand high and fast water.